Photovoltaic cell systems on roof bulidings
            
            
                
                
                    
                        - 
                            The completion of the implementation of (4) stations with a total capacity of 82 kW. Above the roofs of some buildings in the General Authority hall and have been connected to the network as follows :-
                        
 
                        - 
                            Power plant (42) kW above the engineering building
                        
 
                        - 
                            Power plant (30) kW above the engineering building
                        
 
                        - 
                            Power plant (5) kW above the administrative building
                        
 
                        - 
                            Power plant (5) KW above the surface of the main water tank